How long does it take to build an MVP?

Short answer

A tightly scoped first release takes two to three weeks with 99 Francs, and MVPs start from US$5,000 in fixed-price phases. Bigger products take longer: CryptoCrush went from an idea to an accepted Telegram Mini App in about eight weeks, and our own My Chess Rating reached the App Store about three months after work began.

Alexander Vinokurov · Founder · Creative Director
Updated

What makes two to three weeks possible

Scope, not speed. A two to three week MVP is built around one primary user, one core action, one launch surface and one learning loop (analytics, feedback capture and a next-step backlog). Nothing else goes into the first release.

It also needs a small senior team. Our MVPs are founder-led, with one to three specialists assembled around the scope and no layer of account managers between you and the people doing the work.

Timelines from our own work

  • The Pacifica Penthouse: a luxury property website in Webflow, live in four weeks.
  • SimpleV: our own Android app, on Google Play about two weeks after the active build began.
  • CryptoCrush: a founder arrived with only an idea; the client accepted a Telegram Mini App about eight weeks after the first commit, after wireframes, game design and native iOS and Android builds.
  • My Chess Rating: our own native iOS app, live on the App Store about three months after work began.

What stretches the timeline

Multi-role admin systems, complex permission models, heavy custom backend logic, advanced compliance workflows, large migrations and every feature planned for the full product. A tightly scoped MVP leaves these out; a product that needs them takes several phases, and we say so before the first one starts.

How payment follows the schedule

Work runs in fixed-price phases agreed before each begins, with no deposit. You pay at the end of a phase, once you have seen it working, so a longer MVP does not mean paying for weeks you have not seen. The price side is in can you build an MVP at a fixed price.

Guides

Further reading

Start a project

Have a question about your project?

Tell us what you are building and we'll reply within 24 hours on business days.