Can you build an MVP at a fixed price?

Short answer

Yes, in fixed-price phases. 99 Francs MVPs start from $5,000; scope and price are agreed before each phase begins, you pay when the phase works, and revisions inside it cost nothing extra. The total depends on how many phases the MVP needs, not on one guess made on day one.

Alexander Vinokurov · Founder · Creative Director
Updated

What is fixed and what is not

The fixed part is the phase. Before it starts we agree exactly what it delivers and what it costs, and neither changes mid-phase. What we do not do is quote one lump sum for the whole build up front: the total scales with how many phases the MVP actually needs.

The first phase is chosen around what you already have:

  • With a clear vision and real user research, it can go straight to wireframes and user flows.
  • Without that groundwork, it often starts with a Business Model Canvas, a Kano model and research into user pains.
  • If the goal is to raise money, it may be a waitlist landing page or the first slides of a pitch deck.

Fixed price or time and materials

What to compareFixed priceTime and materials
How it worksPrice and scope are agreed before the phase begins.You pay for the actual senior time the phase takes.
RevisionsUnlimited: we iterate until you approve, at no extra cost.Kept minimal by design; you pay only for what is needed.
The trade-offA risk buffer is built into the price.No buffer, so it is often cheaper when revisions are few.

What a tightly scoped MVP holds

A 2-3 week MVP usually includes one core user flow, a launch page, product UI, a focused frontend or app surface, analytics and a feedback loop. It usually leaves out multi-role admin systems, complex permission models, heavy custom backend logic and advanced compliance workflows. In most cases the result is design plus working code, such as the lead-capture landing page for The Pacifica Penthouse in Webflow, or a native iOS app like My Chess Rating.

If the phase is not right

If you are still not satisfied once revisions are exhausted, you owe nothing for that phase. Either side can stop between phases, and you keep the materials produced so far. If a full MVP is more than you need, we say so and often suggest a smaller first phase. The full process is in how we build MVPs with no upfront payment.

Guides

Further reading

Start a project

Have a question about your project?

Tell us what you are building and we'll reply within 24 hours on business days.
Prefer to talk? Book a free intro call.

By sending this you agree to our Privacy Policy.